We’ve successfully moved DYH 500C to Sapphir Group . The DYH 500C was purchased from Siagols Group and sold it out to Sapphir Group ,erected and installed for running. It was a Small project, Drawing was moved from Ground floor of building to ground floor with the help of Lifters. With the mutual work of about 5 workers we moved the Drawings from Ground floor to ground floor in about 5 hours of time. It was the project of 2 Days from 21th Oct to 23 th Oct.